Constructing a Building - the Devil is in the Details

The OnLogic facilities team who were instrumental in the success of the construction of the new global headquarters

The proverb “the devil is in the details” definitely applies to constructing a building. In case you were wondering what that phrase means, dictionary.com spells it out: “even the grandest project depends on the success of the smallest components.” 

When constructing a 150,000 square foot building, you can bet that the devil is in the details! Luckily for us, we had a great team of devil wranglers including Matt Whitman, Mark Fitzko and David Valley to ensure the success of the smallest, and some of the biggest, components of the project. 

A photo of a group of men laughing

“Down to the wire”

A lot of the building features rely on wiring, including the speaker system, network, building automation, and more. 

Overheard at OnLogic: “The music here is a vibe”. 

Truer words were never spoken. We have music playing in all the common spaces of the building. In the morning, it might be light jazz. As the day ramps up, you might hear classic rock, 80s pop, and the newest trending tracks. There is something for everyone. But, music doesn’t just happen. The building needed to be wired for sound.  

The team claims they pulled miles of speaker wire. Not sure if that’s an exaggeration, but it probably isn’t. Before the walls went up, and before there was even heat in the building, they were ensuring that every space had audio capabilities. In fact there are 15 speakers in the café alone. 

The building isn’t just wired for sound, it’s wired for safety and sustainability. Occupancy sensors are a key component of our building automation - you can read more about those in this blog about our sustainable smart building. In fact there are over 300 sensors, and they didn’t just install themselves. The physical access control (PAC) scanners (75 of them) also needed to be wired and connected to the security network. All those wires had to end up someplace and it was David’s job to get them organized and connected to the banks of OnLogic Factor 202 industrial controllers. In fact there are 3 banks of computers, one on every floor. 

A man at a soldering station OnLogic industrial Raspberry Pi computers attached to many wires in an electrical closet

“Nothing was off the table” 

When it came to the odd jobs this team has tackled, nothing was off the table. In fact, sometimes it was the table. In addition to all the collaborative spaces in the common areas, there are 40 conference rooms for meetings and co-working. Every room needed a table, a monitor or two, and sometimes cabinets. 

If you have ever hung a TV at your house, you know how much work that can be - imagine if you had to hang 60 big screens! Speaking of big, some of the tables have room to seat 20 or more. And, they came in pieces - without assembly instructions. But all those parts were no match for our team! 

A large conference room with a big table and double monitors

Large conference room showing the 22’ x 6’ table and double 75” monitors

Except when there were missing parts - which happened more than once. Good thing we have a team of engineers who were able to 3D print some of the missing parts. It truly takes a village to build a building. 

“Pedal to the metal” 

In addition to your standard tables put together with screws, they had a special request from our regulatory team. For performing some of our EMF (electromagnetic field) testing, a table that didn’t have an ounce of metal was needed. It couldn’t even have metal screws. Our team was up for the challenge and they delivered wooden tables held together with glue and wooden dowels.  

An all wooden table used for regulatory testing by OnLogic

“Making a scene” 

While many of the projects completed by this team were behind the scenes, some were very much the scene themselves. They worked with one of OnLogic’s graphic designers, Nathan Hoffmann, to execute his vision for the stairway art. The inspiration behind the art is the OnLogic logo - exploding out into all floors of the building. The art was created digitally, then projected onto the walls. They traced the drawing from the projection to the wall, taped the edges and then added color. All the way up three floors. Sometimes the work had to be done from a scissor lift. 

A man in a hardhat adding tape for a wall muralA series of photos showing stages of mural creation in the OnLogic headquarters. A triumphant man standing at the base of a mural found at the OnLogic headquarters

"Sounds too good to be true"

Another form meets function project they worked on was installing artistic sound dampening custom tiles. In a large meeting room we call the flex space, they again worked with Nathan to create an artistic means of sound dampening. Custom acoustic tiles were ordered and placed by the team according to Nathan’s design - once again projected on the wall. 

Acoustic tile hung in an artistic fashionA large meeting room with acoustic tiles set up artistically

They didn’t "paint themselves into a corner"

Every member of this team truly was a “jack of all trades” - they needed to do a huge variety of projects including art, carpentry, sound engineering, and more. Their can-do attitudes are exactly the kind of people you want on your team, and we're exceedingly lucky, and very grateful, that they're part of ours. If you'd like to see the building for yourself, and this sounds like the kind of team you'd like to join, check out our open positions! 

Sarah Lavoie Content Creator for OnLogic
Sarah Lavoie
Content Marketing / Marketing, OnLogic
Sarah Lavoie is a content creator for OnLogic. When not writing, she can usually be found exploring the Vermont landscape with her camera looking to photograph something amazing.

Stay in the know.

Get first access to the newest products and Industry 4.0 innovation, OnLogic Live! events and more.